Skip to main content
Trains are now able to run as normal following an earlier fault on a train between Ryde Pier Head and Shanklin.
Disruption to Thameslink services through London Bridge following an earlier fault with the signalling system has now ended.
Disruption between London and Stevenage via Potters Bar has now ended.
Disruption following a road vehicle colliding with a bridge at Haywards Heath has now ended.
Disruption following a road vehicle colliding with a bridge at Brentwood earlier has now ended.
Following a fault with the signalling system between Cambridge and Royston trains are now able to run as scheduled.
Disruption caused by the failure of the overhead line equipment at Newcastle has now ended.
Disruption following an earlier broken down train at Brough has now ended.
Following a fault with the signalling system at Goodmayes all lines have reopened and trains are able to run as scheduled.
Trains are now running normally following a trespass incident between East Croydon and Norwood Junction.