Skip to main content
A speed restriction over defective track between Ford and Littlehampton / Arundel / Angmering is causing disruption to journeys between these stations. Trains running between these station may be delayed. Disruption is expected until the end of the day.
A fault with the signalling system at Eastleigh means that some lines are blocked.
Lines have reopened following a fault with the signalling system at Acton Main Line.
Staff have now carried out the safety inspection of the track between Brentwood and Shenfield. Trains running between Romford and Shenfield may still be cancelled or revised whilst service recovers. Disruption is expected until 08:30.Check before you travel:
Engineering works taking place between New Cross Gate and Sydenham have overrun, closing all lines between these stations.As a result, trains may be cancelled or revised.This issue is expected to continue to impact services until 06:30.
Following the emergency services dealing with an incident between Clapham Junction and Peckham Rye, all lines have reopened. As service recovers, trains may still be cancelled, delayed by up to 30 minutes or revised. This is expected until 12:30.
Engineering work is taking place between London Paddington and Slough, closing some lines on Monday to Wednesday evenings.As a result:
A fault with the signalling system in the Wakefield area means that trains have to run at reduced speed on some lines.
All lines have now reopened following an earlier trespass incident at Crosskeys.
A late running freight train at Willesden Junction is causing disruption to trains running between Stratford and Clapham Junction / Richmond. Trains running between these station may be delayed by up to 15 minutes or revised.Disruption is expected until 19:00.