Engineering work is taking place between Lawrence Hill and Bristol Temple Meads, resulting in the closure of some lines.
Engineering work is taking place between Totnes and Plymouth, resulting in the closure of 1 out of 2 lines.
Engineering work is taking place between Chesterfield and Sheffield, closing some lines overnight from Monday evening until Friday morning.
Engineering work is taking place between London St Pancras International and Luton, closing some lines early on Saturday morning.
Engineering work is taking place between Totnes and Plymouth overnight, closing 1 out of 2 lines.
Engineering work is taking place between Bristol Temple Meads and Westbury, closing some lines overnight from Monday evening until Friday morning.
Engineering work is taking place between Stalybridge and Manchester Victoria, closing some lines each night.
Engineering work is taking place between Truro and St Erth, resulting in the closure of some lines.
Some trains between Liskeard and Looe will be retimed at Liskeard.
Engineering work is taking place between Taunton and Bristol Temple Meads, resulting in the closure of some lines.
The 17:12 Bristol Temple Meads to Paignton will terminate at Exeter St Davids.
Engineering work is taking place between Selby and Doncaster, closing some lines.
On Saturday and Sunday, trains will divert via Goole and will not call at Howden or Selby.