Skip to main content
Engineering work is taking place between London Liverpool Street and Barking, closing some lines. As a result all services will be diverted in to London Fenchurch Street via West Ham.
Engineering work is taking place between Malton and Scarborough, closing all lines. As a result of this trains running between York and Scarborough will start / terminate at Malton.  Check before you travel:
Engineering work is taking place between Marsden and Mirfield, closing some lines. The 2040 Manchester Airport to York Will not call at Huddersfield but will additionally call at Brighouse.
Engineering work is taking place between Leicester and Sileby, closing some lines.
Engineering work is taking place between Earlswood and Gatwick Airport, closing various lines on Tuesday to Friday morning.
Engineering work is taking place between Peterborough and Doncaster, closing some lines.
Engineering work is taking place overnight in the Enfield Town area, closing some lines.
Engineering work is taking place between North Wembley and Northampton, closing some lines.
Engineering work is taking place in the Swansea area, closing some lines.As a result, the 18:35 Shrewsbury to Swansea service will divert after Llanelli to terminate at Carmarthen.
Engineering work is taking place between Nottingham and Chesterfield, closing some lines.