Engineering work is taking place between Reading and Blackwater, closing all lines.
Engineering work is taking place between Didcot Parkway and Swindon, closing some lines.
Engineering work is taking place between in the Northolt Park area, closing all lines.
Due to a fault with the signalling system between Leeds and York some lines are currently closed.
Engineering work is taking place between Shepherd's Bush and Watford Junction, closing some lines.
Engineering work is taking place between Reading and Newbury / Bedwyn, closing all lines overnight.The 21:16 Bedwyn to Newbury service will run from Bedwyn to Reading.
Engineering work is taking place overnight between Strood / Gillingham and Rainham, closing some lines.
A tree blocking the railway at Crowhurst means that the line towards London are blocked. Trains running between Hastings and Tonbridge may be cancelled or delayed by up to 30 minutes. Disruption is expected until 21:45. What's happened?
Due to a safety inspection of the track between Walton-On-Thames and Weybridge some lines are closed.
What's Going OnTrain services running to and from these stations may be cancelled, delayed or revised. Disruption is expected until 06:45.
Engineering work is taking place between Reading and Didcot Parkway, closing some lines on Sunday evening.As a result, the following trains will not call at Pangbourne: