Skip to main content
Engineering work is taking place between Preston and Manchester, closing various lines. The 22:13 Friday service from Edinburgh to Manchester Airport will terminate at Preston with a coach provided forward to Manchester Piccadilly and Manchester Airport.
Engineering work is taking place between Faversham and Dover Priory on Monday, Wednesday and Thursday nights, closing some lines.
Engineering work is taking place between Reading and Basingstoke on Saturday evening, and on Sunday morning / evening, closing some lines. Saturday: After 20:30, buses will replace trains between Reading and Basingstoke. Sunday:
Engineering work is taking place at various points on the Northern network, closing some lines. As a result, the following trains will be amended: Monday to Thursday:
Engineering work is taking place between Broxbourne and Audley End / Stansted Airport until 09:10 and between Broxbourne and Bishops Stortford until 12:25, closing all lines. Greater Anglia
Engineering work is taking place between Barking and London Fenchurch Street from 23:30 each day, closing all lines.
Engineering work is taking place in the New Cumnock area, closing all lines each night. Monday to Thursday
Engineering work is taking place between South Croydon and East Grinstead / Uckfield, closing all lines. As a result, services between London Victoria and East Grinstead and between Oxted and Uckfield will not run.
Engineering work is taking place between Avoncliff and Frome, closing all lines overnight.
Engineering work is taking place between Slough and Reading, closing 2 out of 4 lines. Trains between London Paddington and Reading / Didcot Parkway will not call at Burnham or Taplow.  A replacement bus will run between Slough and Taplow on Saturday after 23:00.