Engineering work
is taking place between Barking and Upminster, closing all lines after
22:45 each night from Monday evening until Friday morning.
Ticket acceptance:
Engineering work is taking place between Crewe and Stockport overnight from Monday evening until Friday morning.
A points failure at Harrow & Wealdstone means that trains are currently unable to run between Watford Junction and London Euston.
We anticipate disruption will continue until 11:30.
Alternative travel advice:
Engineering works are taking place between Bicester North and Banbury before 08:40 and after 23:50 on Sunday 3 March.
As a result of this, the following alterations will be in place:
Engineering work is taking place between Stonehouse and Gloucester from 23:35 until 05:15 each night, closing all lines.
Engineering work is taking place overnight between Leeds and Mirfield, closing all lines.
Engineering work is taking place between London Paddington and Slough overnight from Saturday evening until Sunday morning, closing some lines.
As a result, the following trains will be amended:
Engineering work is taking place between London Paddington and Heathrow Airport, closing some lines on Saturday evening.
As a result, the following trains will not run:
Engineering work is taking place between Bristol Temple Meads and Westbury from 23:40 until 05:25 each night, closing all lines.
As a result of this, the 23:20 Bristol Temple Meads to Frome will depart 30 minutes EARLIER than normal each night between Monday and Thursday.
Engineering work is taking place between London Charing Cross and London Bridge on Sunday 24 February, closing all lines.