Skip to main content
Engineering work is taking place between Shenfield and Southminster / Southend Victoria until 09:00, closing all lines. As a result, buses replace trains before 09:00 between:
Engineering work is taking place between Market Harborough and Bedford, closing the line. Buses will replace trains between Market Harborough and Bedford.
Engineering work is taking place between Dalston Kingsland and Stratford, closing all lines after 19:00. From around 18:30, buses will replace trains between Canonbury and Stratford.
Heavy rain has flooded the railway between Narborough and Hinckley, and as a result trains have to run at reduced speed on all lines. Trains between Nuneaton and Leicester may be delayed by up to 30 minutes. Disruption is expected until 18:00.
Heavy rain is flooding the railway between Dullingham and Cambridge and as a result, some lines are blocked. Trains between Cambridge and Newmarket may be cancelled or delay by up to 90 minutes. Disruption is expected until at least 18:30.
Engineering work is taking place overnight between Selhurst / Norwood Junction and Epsom Downs, closing some lines.
Engineering work is taking place between Rugby and Northampton closing the line. The 22:46 Wolverhampton to London Euston is diverted and will not call at Northampton.
Engineering work is taking place between Congleton and Cheadle Hulme closing the line.
Early morning engineering work is taking place between from approximately 00:05 to 06:00 each morning between Sheffield and Chesterfield, closing some lines.
Engineering work is taking place between Paisley Gilmour Street and Kilwinning, closing the line. Buses will replace trains between Paisley Gilmour Street and Kilwinning.