Skip to main content
Engineering work is taking place between Pitsea and Southend Central, closing all lines.Buses will replace trains between Pitsea and Southend Central.
Engineering work is taking place between Westbury and Warminster, closing all lines.Buses will replace trains between Westbury and Warminster.
A tree blocking the railway between Birmingham Snow Hill and Stourbridge Junction means all lines is blocked. Trains running between these stations may be delayed by up to 20 minutes or revised.Disruption is expected until 12:00.Customer advice:
A fault with the signalling system between Hatfield Peverel and Chelmsford means trains have to run at reduced speed.
A points failure at London Waterloo means that some lines are disrupted. Trains running to / from this station may be delayed.
Engineering work is taking place on Saturday and Sunday between York and Newcastle, closing all lines.Due to the above works the following amendments will be made to Friday service.
Engineering work is taking place between Wimbledon and Sutton, closing some lines on Sunday morning.As a result:
A fault with the signalling system between Trimley and Derby Road means that trains have to run at reduced speed on the line between Ipswich and Felixstowe.
The train driver who was scheduled to work between Slough and Windsor & Eton Central has been taken ill this morning. As a result of this, trains are unable to run between these stations, and have been cancelled.Disruption is expected until 07:45.
Overrunning engineering works between Liss and Guildford means that all lines are blocked. Trains running between these stations may be cancelled or revised.