Engineering work is taking place each day from 00:01 to 04:00, between Shrewsbury and Crewe closing the line.
Buses will replace trains between Shrewsbury and Crewe.
Engineering work is taking place between Shepherds Bush and Watford Junction from 20:00 on Saturday and all day on Sunday, closing all lines.
Engineering work is taking place between Edenbridge and Tonbridge closing the line.
Buses will replace trains between Edenbridge and Tonbridge.
Check before you travel:
Trespassers on the railway at Peterborough are causing disruption to trains at this station.
Trains at Peterborough may be cancelled or delayed. Disruption is expected until the end of the day.
Engineering work is taking place between Barking and London Liverpool Street, closing all lines.
Engineering work is taking place in the Hertford North area, closing all lines.
Buses will replace trains between Alexandra Palace and Stvenage via Hertford North.
Engineering work is taking place between Royston and Cambridge until 09:45, closing all lines.
Buses will replace trains between Royston and Cambridge.
Engineering work is taking place between Ipswich and Woodbridge / Felixstowe, closing all lines.
As a result, buses will replace trains between:
A tree blocking the railway between Didcot Parkway and Oxford is causing disruption between these stations. Trains may be cancelled, delayed or revised. This is expected until 22:00.
Animals on the railway at Lowdham are causing disruption to trains between Nottingham and Newark Castle. Trains may be delayed by up to 30 minutes or cancelled until approximately 13:00.