Skip to main content
Major engineering work is taking place between Huddersfield and Leeds on weekdays from Monday 21 October until Friday 22 November as part of the TransPennine Route Upgrade, closing all lines.
Heavy rain flooding the railway between Blackfriars and London St Pancras International means all lines are blocked.
A points failure at Three Bridges means trains between Three Bridges and Horsham may be delayed by up to 20 minutes, cancelled or diverted.
The emergency services are dealing with an incident between Staines and Feltham meaning all lines are blocked. As a result, trains may be cancelled or delayed by up to 60 minutes. Major disruption is expected until 18:00. Customer Advice:
A failure of the electricity supply between Hitchin and Royston means trains running between these stations may be delayed by up to 30 minutes, rev
Due to a fault with the signalling system at Woking, trains through the station may be delayed by up to 30 minutes or revised.
A points failure at Hastings means some lines are currently disrupted. As a result, trains may be cancelled, delayed by up to 20 minutes or revised.
Lines have reopened following vandalism on a train between Cambridge and Ely. Trains may still be cancelled, delayed or revised.
A fault with the signalling system at Gravesend is causing disruption to journeys through this station.
All lines have reopened between Coulsdon South and Purley following a road vehicle colliding with a bridge between these stations.