Engineering work is taking place between Severn Tunnel Junction and Patchway, closing some lines.
As a result, the following trains will be amended:
Monday to Wednesday:
- The 23:27 Cardiff Central to Bristol Temple Meads service will depart Patchway and beyond about 5 minutes later than usual.
Monday to Thursday:
- The 23:30 London Paddington to Cardiff Central service will divert after Bristol Temple Meads via Bedminster (not calling). The service will change direction of travel, and run a few minutes later than usual after Bristol Temple Meads.
Thursday:
- The 22:45 London Paddington to Swansea and the 23:30 London Paddington to Cardiff Central will run 5 minutes later than usual between Patchway and Severn Tunnel Junction.
Check before you travel:
These changes are not currently shown in the National Rail Enquiries Journey Planner, please check back nearer to the time of travel.
Project Information:
You can read more about engineering work and why it is necessary.