Engineering work is taking place in the Filton Abbey Wood area, closing some lines on Saturday.The 16:44 Penzance to Cardiff Central will operate in two parts:
There is a fire next to the track between Newport (South Wales) and Cardiff Central, closing all lines running between these stations.This means that trains may be cancelled, severely delayed by up to 60 minutes or revised.
Engineering work is taking place overnight between Radyr and Cardiff Central via Danescourt, closing some lines.
Engineering work is taking place between Severn Tunnel Junction and Patchway, closing some lines.
As a result, the following trains will be amended:
Monday to Wednesday:
Engineering work is taking place between Bridgend and Cardiff Central, closing all lines.
Engineering work is taking place between Hereford and Abergavenny, closing some lines.
As a result the following amendments will apply:
Engineering work is taking place earl morning between Shrewsbury and Hereford, closing some lines.
Engineering work is taking place overnight between Newport and Cwmbran, closing some lines.
Engineering work is taking place overnight between Hereford and Cardiff Central, closing all lines.As a result, the following amendments will apply:
A shortage of train drivers between Cardiff Central and Nottingham means a reduced service will run between these stations. Trains may be cancelled or revised.
Disruption is expected until the end of the day.
Alternative travel advice: