Engineering work is taking place between London Paddington and Heathrow / Reading, closing all lines very early on Sunday morning.
Elizabeth line:
The 00:07 Heathrow Terminal 5 to London Paddington service will start at 00:12 and will terminate at Ealing Broadway.
Before 07:40, no trains will run between Ealing Broadway and London Paddington.
Great Western Railway:
The 06:20 Reading to London Paddington will depart at 06:36 and operate later throughout.
The 06:38 London Paddington to Didcot Parkway will start from Ealing Broadway. London Underground connections from Central London to Ealing Broadway.
The 07:51 London Paddington to Penzance will depart earlier than usual at 07:46.
The 08:33 London Paddington to Swansea (terminating Port Talbot Parkway) will depart earlier than usual at 08:23.
The 08:36 London Paddington to Didcot Parkway will depart at 08:46.
The 08:43 London Paddington to Great Malvern will depart earlier than usual at 08:42.
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
You can plan your journey on London Underground by using the Transport for London Journey Planner