Engineering work is taking place between London Fenchurch Street / London Liverpool Street and Barking, closing various lines.
Engineering work is taking place between Guildford and Reading, and between Woking and Haslemere until 16:00; and then between Guildford and Haslemere from 16:00.
CrossCountry
Engineering work is taking place as part of the Crossrail project between Twyford and Slough, closing 2 out of the 4 lines. This will affect local stopping trains and will not impact High Speed trains.
Engineering work is taking place between Didcot Parkway / Oxford Parkway and Oxford, closing all lines.Chiltern Railways:
Following a trespass incident in the Cambridge area all lines have reopened.
A fault on the train that runs between Cleethorpes and Barton-on-Humber means that service between these stations has been suspended. Trains running between these stations will be cancelled. Disruption is expected until 11:00. Customer advice
Following heavy rain flooding the railway. the line is closed between Derby and Stoke-on-Trent. Trains are currently unable to run between these stations.
A trespass incident at London Kings Cross is causing disruption to journeys through the station.
The emergency services are dealing with an incident between Birmingham Moor Street and Tyseley. So they can safely carry out their work all lines are currently closed.Services will be cancelled or revised until lines can be reopened.
A derailment within the depot between Dartford and London Bridge means all lines are closed. As a result, trains running to and from these stations will be cancelled or diverted via Bexleyheath.This is expected until 12:00.Customer Advice