A shortage of train crew means that fewer trains are able to run. As a result, Thameslink services across the network may be cancelled or revised.Disruption is expected to affect services from 23:30 tonight until 07:00 on March 25.Customer advice:
Engineering work is taking place between London Blackfriars and East Croydon / Crystal Palace, closing all lines via Sydenham.
Engineering work is taking place overnight at various locations on the Southeastern network, closing some lines.Monday only:
Engineering work is taking place between Sevenoaks and Tonbridge, closing all lines. The line will be further closed between Orpington and Sevenoaks on Sunday.Saturday
Engineering work is taking place at various locations on the Southeaster, closing some lines overnight from Monday evening until Friday morning.Monday only:
There is a fault with the signalling system between Moorgate and Finsbury Park. As a result, trains have to run at reduced speed on the line towards Moorgate.
Engineering work is taking in and around Sheffield station, closing some lines.
CrossCountry:
Engineering work is taking place between Bradford Interchange / Doncaster and London Kings Cross on Saturday 6 and Sunday 7 March, closing some lines.
As a result, the following changes will apply:
A problem currently under investigation at Ramsgate is causing disruption to journeys through Ramsgate. As a result of this, trans may be cancelled, delayed or revised.
Disruption is expected until 12:15.
What's happened?
A trespass incident between St Albans City and Bedford is causing disruption between these stations. Trains may be delayed, cancelled or revised.