Engineering work is taking place overnight in the Ealing Broadway area, closing some lines.
Elizabeth line:
The last departure 00:07 Heathrow Airport to London Paddington will terminate at Ealing Broadway. Until 07:40
Services to / from Heathrow Airport / Reading will start / terminate at Ealing Broadway. You should use local London Underground stations between Ealing Broadway and London Paddington.
After 07:40
Services between Abbey Wood and Heathrow Airport Terminal 4 will be reduced to 2 trains per hour.
Services between Abbey Wood and Maidenhead will start / terminate at London Paddington Lower Level.
Hayes & Harlington, Southall and Ealing Broadway will be reduced to 6 trains per hour.
Acton Main Line, Hanwell and West Ealing will not get a service.
The Reading service will now call at Iver.
Heathrow Express:
London Paddington to Heathrow Airport Terminals 2 and 3 - Heathrow Airport Terminal 5:
Services will start up later than normal. Then until late-evening a revised service (every 30 minutes) will operate. After this a normal service (every 15 minutes) will operate. From London Paddington to Heathrow Terminal 5:
First train 07:40, then every 15 mins until 09:25.
Then at 09:55 and every 30 minutes until 21:55.
Then every 15 minutes until 23:25.
(Additional shuttles will operate from Heathrow Terminals 2 and 3 to Heathrow Terminal 5 at 05:13 and every 15 minutes until 07:28, then 07:46, also 21:57).
From Heathrow Airport Terminal 5 to London Paddington:
First train 07:27, then every 15 mins until 09:27.
Then at 09:57 and every 30 minutes until 21:57.
Then every 15 minutes until 23:57.
(Additional shuttles will operate from Heathrow Terminal 5 to Heathrow Terminals 2 and 3 at 05:12 and every 15 minutes until 07:12).
Check before you travel:
You can plan your journey using the National Rail Enquiries Journey Planner
You can plan your journey on London Underground by using the Transport for London Journey Planner