Engineering work is taking place each night from approximately 21:00 to 05:00, finishing 05:00 Friday morning, between Slough and Reading, closing 2 out of four lines.
Engineering work is taking place between Bournemouth / Poole and Weymouth, closing lines from 23:30 on Saturday and all day on Sunday.
From 23:30 on Saturday until 09:15 on Sunday:
Engineering work is taking place overnight between Birmingham New Street and Smethwick Galton Bridge, closing some lines.
Engineering work is taking place between London Paddington and Slough closing some lines.
The 01:00 London Padding to Reading is replaced by a bus between London Paddington and Slough.
Engineering work is taking place between Polegate and Eastbourne, and between Eastbourne and St Leonards, closing lines on Saturday and Sunday.
Saturday:
A broken down train at Carnoustie means the line towards Aberdeen is blocked. As a result of this, trains may be delayed or revised.
This is expected until 10:00.
ScotRail Customer Advice:
Engineering work is taking place at Ashford International, closing platforms 3 to 6.
Engineering work is taking place on 3 out of 4 tracks between Acton Main Line and Southall from 23:45 until the end of the day on Satruday 16 November.
Engineering work is taking place between Virginia Water and Wokingham, closing all lines.
As a result of this, the following alterations will be in place:
Saturday and Sunday:
Engineering work is taking place between New Malden and Strawberry Hill, closing the lines.